Vending Machine Enclosure — Snack & Drink Cabinets
Vending machine cabinet for snack, drink and combo units: door and body formed as a matched pair so the glass front seals evenly, reinforced hinge side, coin and card module cutouts per the payment supplier’s drawing, and levelling feet rated for a full column of product. Made by WERIX Metal from SPCC 1.5-2.0mm / SECC 1.2mm to a tolerance of ±0.1mm, finished with powder coat + vinyl wrap. Typical order volume is from 10 to 5000+. Free DFM quote within 24 hours.
Engineering drawing available on request
Send your target specifications — we reply with a drawing and a DFM quote within 24 hours.
Vending Machine Enclosure — Snack & Drink Cabinets
Vending machine cabinet for snack, drink and combo units: door and body formed as a matched pair so the glass front seals evenly, reinforced hinge side, coin and card module cutouts per the payment supplier’s drawing, and levelling feet rated for a full column of product.
| Part number | P-092 |
|---|---|
| Product type | Vending Machine Cabinet |
| Industry | Banking & Financial |
| Material | SPCC 1.5-2.0mm / SECC 1.2mm |
| Tolerance | ±0.1mm |
| Surface Finish | powder coat + vinyl wrap |
| Manufacturing processes | laser cutting · CNC bending · spot welding |
| MOQ / Volume | from 10 to 5000+ |
Vending Machine Enclosure — Snack & Drink Cabinets: manufacturing notes
This part — vending machine enclosure — snack & drink cabinets — is manufactured in our Dongguan plant. The notes below explain the manufacturing decisions behind the specification: why this material, why this forming sequence, and what the tolerance actually requires in production.
Why this part is made in galvanised steel
Vending Machine Enclosure — Snack & Drink Cabinets is specified in SPCC 1.5-2.0mm / SECC 1.2mm. Galvanised sheet carries a zinc layer that protects sheared and lasered edges where the coating cannot reach, which is why it is the default choice for outdoor and humid-service parts. It welds cleanly if the zinc is dressed back at the joint, and it takes powder coat without a primer as long as the surface is degreased and the pre-treatment is phosphated rather than simply washed.
How the part is formed
The production route for this part is laser cutting, CNC bending, spot welding. Fiber laser cutting separates the blank without hard tooling, which is what makes a first article economical: the profile can change between the prototype and the production run without a die sunk. The trade-off is a small heat-affected edge, so on parts that will be painted we deburr and, where the edge is a sealing face, dress it flat before coating. Bending is where most tolerance stack enters a sheet metal part. We set the bend allowance from the part’s own material and radius using the K-factor the press is running, then verify the first article on the machine rather than from the drawing, because springback moves with material batch and grain direction.
What ±0.1mm actually requires on the shop floor
The drawing calls for ±0.1mm. On a part like this that is a process decision, not an inspection decision: it fixes which machine holds the critical features, how the part is fixtured for each operation, and whether a formed feature can be checked after coating or has to be measured before it. We confirm the first article against the drawing and record the values, so the tolerance is demonstrated rather than assumed. If a dimension in your drawing is tighter than this part needs, it is usually worth relaxing it — over-toleranced features are one of the quietest cost drivers in a sheet metal quote.
Finishing: powder coating
powder coat + vinyl wrap. Powder coating builds a film of roughly 60–120 µm per face and cures at 180–200 °C. Two consequences get designed for: the film adds to every mating dimension, and the cure temperature is high enough to move an unsupported panel, so stiffening or return flanges go in before the part reaches the oven. Colour is matched to the RAL range given on the drawing.
Frequently asked questions
- What is the minimum order quantity for vending machine enclosure — snack & drink cabinets?
- The order range for this part is from 10 to 5000+. Below the low end of that range the tooling and setup are spread over too few pieces to be economic, so if you are prototyping we would normally build the first units from the same process route and quote the production quantity separately.
- Can the material be changed to reduce cost or weight?
- Yes, and it is worth asking before the design is frozen. The current specification for this part is SPCC 1.5-2.0mm / SECC 1.2mm; depending on the service environment, a different grade or a lighter gauge with formed stiffening can meet the same requirement. What we would not do is change the material without re-checking the bend radii, the welding process and the coating system, because all three move with the substrate.
- What finishing options are available for this part?
- The current finish specification is powder coat + vinyl wrap. Powder coating, anodising, zinc or nickel plating, brushing and blasting are all available in-house, so the finish can be changed without changing supplier — and where the part will be seen, we match colour to the RAL or Pantone reference on your drawing.
- How long does production take, and what do you need from us to quote?
- Prototypes are typically 3–7 business days and production runs 7–15 days once the drawing is released and the finish is confirmed. To quote we need the drawing or CAD file (STEP, DXF, DWG, IGES or PDF), the material and finish, the quantity and the destination — and any tolerance or inspection requirement that is not already on the drawing. You get a DFM review with the quotation, not after it.
Sheet metal engineering guides
Zinc Plating vs Nickel PlatingZinc protects steel even when scratched, for cents. Nickel is harder and brighter but 3-5x the cost. The finish decision, in one table.Read More
8 Proven Ways to Cut Sheet Metal Costs Without Sacrificing QualityFrom bend radius optimization to material nesting — eight actionable design and sourcing strategies that reduce cost while maintaining part performance.Read More