Rack-Mount Blanking Panel
1U/2U filler panels for unused rack-mount spaces in server cabinets. Prevents hot air recirculation through empty slots, maintaining proper airflow direction and cooling efficiency. Ultra-high-volume commodity product — every data center rack uses dozens of these panels. Made by WERIX Metal from SPCC steel 1.0mm / AL5052 aluminum 1.0mm to a tolerance of ± 0.10 mm, finished with Powder coat black or brushed aluminum. Typical order volume is From 100 to 100,000+ volume. Free DFM quote within 24 hours.
Engineering drawing available on request
Send your target specifications — we reply with a drawing and a DFM quote within 24 hours.
Rack-Mount Blanking Panel
1U/2U filler panels for unused rack-mount spaces in server cabinets. Prevents hot air recirculation through empty slots, maintaining proper airflow direction and cooling efficiency. Ultra-high-volume commodity product — every data center rack uses dozens of these panels.
| Part number | P-018 |
|---|---|
| Product type | panel |
| Industry | Data Center |
| Material | SPCC steel 1.0mm / AL5052 aluminum 1.0mm |
| Tolerance | ± 0.10 mm |
| Surface Finish | Powder coat black or brushed aluminum |
| Manufacturing processes | Stamping · CNC Bending |
| MOQ / Volume | From 100 to 100,000+ volume |
Rack-Mount Blanking Panel: manufacturing notes
Rack-Mount Blanking Panel has to survive its application, not just its inspection report. This page sets out how the part is actually made — the material decision, the forming sequence and the tolerance strategy — so a buyer or engineer can judge whether the specification matches the application before a drawing is even sent.
Why this part is made in aluminium
Rack-Mount Blanking Panel is specified in SPCC steel 1.0mm / AL5052 aluminum 1.0mm. Aluminium buys weight reduction and thermal conductivity, at the cost of stiffness: a section that is stiff enough in 1.5 mm steel needs either a thicker gauge or formed stiffeners in aluminium. It anodises rather than paints when a hard, non-flaking surface is wanted, and it needs dedicated tooling and fixturing because the soft surface marks easily during handling.
How the part is formed
The production route for this part is Stamping, CNC Bending. Stamping moves the cost from the labour line to a hardened die, which pays off from a few thousand pieces upward: cycle time stops being a labour cost and becomes machine time, and every subsequent part inherits the die’s tolerances instead of the operator’s. Below that volume the same geometry is normally lasered and formed. Bending is where most tolerance stack enters a sheet metal part. We set the bend allowance from the part’s own material and radius using the K-factor the press is running, then verify the first article on the machine rather than from the drawing, because springback moves with material batch and grain direction.
What ± 0.10 mm actually requires on the shop floor
The drawing calls for ± 0.10 mm. On a part like this that is a process decision, not an inspection decision: it fixes which machine holds the critical features, how the part is fixtured for each operation, and whether a formed feature can be checked after coating or has to be measured before it. We confirm the first article against the drawing and record the values, so the tolerance is demonstrated rather than assumed. If a dimension in your drawing is tighter than this part needs, it is usually worth relaxing it — over-toleranced features are one of the quietest cost drivers in a sheet metal quote.
Finishing: powder coating
Powder coat black or brushed aluminum. Powder coating builds a film of roughly 60–120 µm per face and cures at 180–200 °C. Two consequences get designed for: the film adds to every mating dimension, and the cure temperature is high enough to move an unsupported panel, so stiffening or return flanges go in before the part reaches the oven. Colour is matched to the RAL range given on the drawing.
Frequently asked questions
- What is the minimum order quantity for rack-mount blanking panel?
- The order range for this part is From 100 to 100,000+ volume. Below the low end of that range the tooling and setup are spread over too few pieces to be economic, so if you are prototyping we would normally build the first units from the same process route and quote the production quantity separately.
- Can the material be changed to reduce cost or weight?
- Yes, and it is worth asking before the design is frozen. The current specification for this part is SPCC steel 1.0mm / AL5052 aluminum 1.0mm; depending on the service environment, a different grade or a lighter gauge with formed stiffening can meet the same requirement. What we would not do is change the material without re-checking the bend radii, the welding process and the coating system, because all three move with the substrate.
- What finishing options are available for this part?
- The current finish specification is Powder coat black or brushed aluminum. Powder coating, anodising, zinc or nickel plating, brushing and blasting are all available in-house, so the finish can be changed without changing supplier — and where the part will be seen, we match colour to the RAL or Pantone reference on your drawing.
- How long does production take, and what do you need from us to quote?
- Prototypes are typically 3–7 business days and production runs 7–15 days once the drawing is released and the finish is confirmed. To quote we need the drawing or CAD file (STEP, DXF, DWG, IGES or PDF), the material and finish, the quantity and the destination — and any tolerance or inspection requirement that is not already on the drawing. You get a DFM review with the quotation, not after it.
Sheet metal engineering guides
8 Proven Ways to Cut Sheet Metal Costs Without Sacrificing QualityFrom bend radius optimization to material nesting — eight actionable design and sourcing strategies that reduce cost while maintaining part performance.Read More
DFM for Sheet Metal: Essential Design Rules That Save Cost and Prevent Production FailuresDesign-for-manufacturing rules for sheet metal — minimum hole sizes, bend radii, edge distances, tab-and-slot design, and common mistakes that cause scrap.Read More

