Hot/Cold Aisle Containment Panels
Sheet metal ceiling panels, vertical barrier panels, and sliding door frames for hot aisle and cold aisle containment systems in data centers. Optimizes cooling efficiency by preventing hot and cold air mixing, reducing PUE by 15-30% in modern data center designs. Made by WERIX Metal from SGCC galvanized steel 1.0mm to a tolerance of ± 0.1 mm, finished with Galvanized + powder coat white. Typical order volume is From 50 panels to 5,000+ volume. Free DFM quote within 24 hours.
Engineering drawing available on request
Send your target specifications — we reply with a drawing and a DFM quote within 24 hours.
Hot/Cold Aisle Containment Panels
Sheet metal ceiling panels, vertical barrier panels, and sliding door frames for hot aisle and cold aisle containment systems in data centers. Optimizes cooling efficiency by preventing hot and cold air mixing, reducing PUE by 15-30% in modern data center designs.
| Part number | P-013 |
|---|---|
| Product type | panel |
| Industry | Data Center |
| Material | SGCC galvanized steel 1.0mm |
| Tolerance | ± 0.1 mm |
| Surface Finish | Galvanized + powder coat white |
| Manufacturing processes | Laser Cutting · CNC Bending · Riveting |
| MOQ / Volume | From 50 panels to 5,000+ volume |
Hot/Cold Aisle Containment Panels: manufacturing notes
Every part we ship has to perform in service, not just pass inspection. Below is how this hot/cold aisle containment panels is specified and manufactured at WERIX, and which details in the drawing drive cost, lead time and yield.
Why this part is made in galvanised steel
Hot/Cold Aisle Containment Panels is specified in SGCC galvanized steel 1.0mm. Galvanised sheet carries a zinc layer that protects sheared and lasered edges where the coating cannot reach, which is why it is the default choice for outdoor and humid-service parts. It welds cleanly if the zinc is dressed back at the joint, and it takes powder coat without a primer as long as the surface is degreased and the pre-treatment is phosphated rather than simply washed.
How the part is formed
The production route for this part is Laser Cutting, CNC Bending, Riveting. Fiber laser cutting separates the blank without hard tooling, which is what makes a first article economical: the profile can change between the prototype and the production run without a die sunk. The trade-off is a small heat-affected edge, so on parts that will be painted we deburr and, where the edge is a sealing face, dress it flat before coating. Bending is where most tolerance stack enters a sheet metal part. We set the bend allowance from the part’s own material and radius using the K-factor the press is running, then verify the first article on the machine rather than from the drawing, because springback moves with material batch and grain direction.
What ± 0.1 mm actually requires on the shop floor
The drawing calls for ± 0.1 mm. On a part like this that is a process decision, not an inspection decision: it fixes which machine holds the critical features, how the part is fixtured for each operation, and whether a formed feature can be checked after coating or has to be measured before it. We confirm the first article against the drawing and record the values, so the tolerance is demonstrated rather than assumed. If a dimension in your drawing is tighter than this part needs, it is usually worth relaxing it — over-toleranced features are one of the quietest cost drivers in a sheet metal quote.
Finishing: powder coating
Galvanized + powder coat white. Powder coating builds a film of roughly 60–120 µm per face and cures at 180–200 °C. Two consequences get designed for: the film adds to every mating dimension, and the cure temperature is high enough to move an unsupported panel, so stiffening or return flanges go in before the part reaches the oven. Colour is matched to the RAL range given on the drawing.
Frequently asked questions
- What is the minimum order quantity for hot/cold aisle containment panels?
- The order range for this part is From 50 panels to 5,000+ volume. Below the low end of that range the tooling and setup are spread over too few pieces to be economic, so if you are prototyping we would normally build the first units from the same process route and quote the production quantity separately.
- Can the material be changed to reduce cost or weight?
- Yes, and it is worth asking before the design is frozen. The current specification for this part is SGCC galvanized steel 1.0mm; depending on the service environment, a different grade or a lighter gauge with formed stiffening can meet the same requirement. What we would not do is change the material without re-checking the bend radii, the welding process and the coating system, because all three move with the substrate.
- What finishing options are available for this part?
- The current finish specification is Galvanized + powder coat white. Powder coating, anodising, zinc or nickel plating, brushing and blasting are all available in-house, so the finish can be changed without changing supplier — and where the part will be seen, we match colour to the RAL or Pantone reference on your drawing.
- How long does production take, and what do you need from us to quote?
- Prototypes are typically 3–7 business days and production runs 7–15 days once the drawing is released and the finish is confirmed. To quote we need the drawing or CAD file (STEP, DXF, DWG, IGES or PDF), the material and finish, the quantity and the destination — and any tolerance or inspection requirement that is not already on the drawing. You get a DFM review with the quotation, not after it.
Sheet metal engineering guides
8 Proven Ways to Cut Sheet Metal Costs Without Sacrificing QualityFrom bend radius optimization to material nesting — eight actionable design and sourcing strategies that reduce cost while maintaining part performance.Read More
DFM for Sheet Metal: Essential Design Rules That Save Cost and Prevent Production FailuresDesign-for-manufacturing rules for sheet metal — minimum hole sizes, bend radii, edge distances, tab-and-slot design, and common mistakes that cause scrap.Read More