客户评价

4.7
全部来自已验证的购买

通过订单交付后的邮件和WhatsApp收集的反馈。

Pat· 工程副总裁美国回头客
2026年5月2日

评价为买家原文(英语)。

18 months in, Tom is still our go-to engineer on their side. What I appreciate is he doesn't just rubber-stamp our desig...

SPCC
Omar· 供应链主管阿拉伯联合酋长国
2026年3月28日

评价为买家原文(英语)。

400 SPCC control panel enclosures for our HVAC projects across Abu Dhabi. Jack was our main contact and he kept us in th...

SPCC
Rachel· 供应链总监美国回头客
2026年3月15日

评价为买家原文(英语)。

Ordered 2,000 AL5052 parts for a kiosk enclosure project. Got the quote back in about 18 hours — pretty fast for a custo...

AL5052
Sarah· 运营经理美国回头客
2026年2月28日

评价为买家原文(英语)。

Third order for aluminum housings now. What keeps us coming back is the consistency — finish quality has been identical ...

AL5052
...

来自我们订单的真实案例

五个匿名化项目,附买家最关心的数字。客户名称依保密协议隐藏,可按需安排参考客户通话。

WERIX MetalWERIX Metal · Case Study
Tier-1 automotive supplier · Germany · Purchasing & QualityProgressive-die stamped mounting bracket assembly
Automotive / EV
批量范围
60,000 pcs / month
公差
±0.05 mm
材料
SPCC 2.0 mm, zinc plated
交付周期
24 days per release

客户难题 · The bracket had moved to a second supplier after the first die began producing burred pierced holes; rework had climbed to roughly 12% of each lot and the customer was paying for hand deburring on every shipment.

我们的改法 · We rebuilt the progressive die in our own tool room — 11 stations, revised punch-to-die clearance for the 2.0 mm SPCC, and a countersink station added inside the die so the chamfer no longer needed a second operation.

结果 · Burr-related rework fell to 0.4% over the first three months of production. Removing the off-line deburring step cut piece cost by about 18% while tightening the pierced-hole tolerance to ±0.05 mm, and every release now ships with a first-article inspection report.

Data-centre rack OEM · United States · Manufacturing Engineering19" rack side panels and PDU enclosures
Data centre
批量范围
4,000 pcs / shipment
公差
±0.1 mm
表面处理
Powder coat, RAL 7035
交付周期
12 consecutive months on time

客户难题 · Panels up to 1,200 mm long bowed slightly after the powder-coat oven, so rack assembly teams had to force panels into position and the finished cabinets showed uneven door gaps.

我们的改法 · We pre-stress-relieved the bends and moved the panels through the cure oven on a jigged rack instead of a flat tray, then added a flatness check with a dial gauge on a granite surface plate before packing.

结果 · Flatness across a 1,200 mm panel is held within 1.5 mm, and 12 consecutive monthly shipments arrived on schedule with no flatness rejections. Panels and PDU enclosures now ship in the same mixed pallet, which removed one inbound handling step for the customer.

Packaging machinery builder · Netherlands · Technical PurchasingControl cabinet enclosures and harness brackets
Industrial automation
批量范围
300–800 pcs per order
公差
±0.2 mm
材料
SPCC 1.2 mm
交付周期
3–4 orders per year

客户难题 · The customer’s cabinet drawing placed ventilation slots directly beneath two internal mounting bosses, so the thread inserts would have broken through the slot edges during assembly — a fault only visible once the first cabinets were fitted out.

我们的改法 · Because the DFM review happens before quoting, our engineer flagged the conflict in the same 24-hour turnaround: the slot bank was shifted 18 mm, a stiffening rib added across the door opening, and the insert position adjusted without changing the cabinet envelope.

结果 · No re-tooling was needed and the customer avoided rebuilding a batch of cabinets. Repeat order flow continued at three to four releases a year with the same drawing revision, and the rib addition removed a visible door flex that had been reported in the field.

Semiconductor equipment maker · Japan · Process Engineering304 stainless shielding plates for cleanroom tools
Equipment / semiconductor
批量范围
50–200 pcs per release
公差
±0.05 mm
材料
304 stainless, 1.5 mm
表面处理
Brushed, Ra ≤ 0.8 µm

客户难题 · Handling scratches on the brushed surface were being read as contamination during the customer’s incoming inspection, and each rejected plate had to be re-brushed and re-cleaned before it could be fitted.

我们的改法 · Brush direction is now fixed across the whole plate so the grain reads uniformly, both faces are masked with PE film immediately after grain finishing, and plates are packed individually in clean bags rather than stacked.

结果 · Incoming inspection rejections dropped to near zero, and surface roughness is certified at Ra ≤ 0.8 µm on the inspection report that ships with each lot. The customer has since moved two additional plate families to the same drawing standard.

Battery-storage integrator · Spain · Product EngineeringBESS module trays with heatsink brackets
New energy / BESS
批量范围
2,500 pcs / month
公差
±0.15 mm
材料
SGCC 1.5 mm + anodised brackets
交付周期
18 days per release

客户难题 · The original 2.0 mm tray showed measurable deflection under a 45 kg module during transit testing, and the extra gauge added cost and weight the customer’s mounting frame was not designed for.

我们的改法 · Our engineer ran a rib-pattern study with the customer’s load case, replaced the flat tray floor with a formed rib layout and switched the heatsink bracket to anodised aluminium, keeping the mounting hole pattern unchanged.

结果 · The tray passed ISTA-3A transit testing on the first submission at 1.5 mm gauge, cutting tray weight by about 12% and removing the need for a mid-span stiffener. Volume has held at 2,500 trays a month across three module variants.

客户身份依双向保密协议匿名。以上数字均取自该项目由我方出具的检验与发运记录——首件检验报告、尺寸报告与运输测试结果可应要求提供。