Şirket

Yüklenmeden Teslimata: WERIX Siparişiniz Fabrikamızdan Nasıl Geçer

T

Tom

Kıdemli Süreç Mühendisi

|
İçindekiler

Tek Fabrika, Tek Sipariş

WERIX, Dongguan tesisinde 9 sac metal alt sürecini yürütür. Tek bir satınalma emri ham levhadan paketlenmiş kadar her şeyi kapsar.

Werix Metal company logo — direct source factory for sheet metal fabrication and metal stamping in Dongguan, China
WERIX Metal — 100% in-house sheet metal and stamping, one purchase order from raw sheet to packed carton

Adım 1 - Dosyanızı Yükleyin, 24 Saat İçerisinde Teklif Alın

Süreç, STEP, IGES, DXF veya DWG dosyalarınızı çevrimiçi yükleme portalımız aracılığıyla göndermenizle başlar.

  • Accepted file formats: STEP, IGES, DXF, DWG, SolidWorks, Inventor, Fusion 360 exports
  • No minimum order quantity for sheet-metal parts — from single prototypes to production runs
  • All quotes include DFM flags: items that need geometry changes are clearly marked
  • Material sourcing: we stock CR steel, 304/316 stainless, 5052/6061 aluminum, copper, and brass in standard gauges

AI-Powered Quoting, Engineer-Validated

Our quotation system is built on a knowledge base of 11 years of WERIX production data — cycle times, material costs, setup patterns, and verified order outcomes. A RAG (Retrieval-Augmented Generation) architecture with a fine-tuned AI model finds the most relevant historical data for each new part and generates pricing calibrated to our equipment. Every quote is then reviewed by a senior engineer who verifies DFM feasibility, checks material availability, and adjusts for project-specific details. The AI handles the heavy calculation; the engineer handles the judgment.

Adım 2 - Özel Mühendis İncelemesi ve DFM Geri Bildirimi

WERIX'teki her projeye, ilk örnektan kitlesel üretime kadar siparişi takip eden tek bir atanmış mühendis atanır.

  • DFM review covers: minimum bend radius, flange length, hole-to-edge gaps, tolerance feasibility, and finish compatibility
  • Your engineer provides a marked-up report with specific callouts — not generic checklists
  • Design revisions are handled iteratively: upload a revised file, get updated pricing within hours
  • For complex assemblies, the engineer reviews the full BOM for process consolidation opportunities

Adım 3 - Teklif Onayı

Mühendis DFM incelemesini tamamladığı zaman, resmi teklif onayınız için size gönderilir.

  • Quote includes: per-part price, material grade and gauge, finish specification, lead time, and shipping terms
  • DFM recommendations are listed separately — you decide which to accept before we proceed
  • Revisions welcome: if the quote exceeds your budget, your engineer can suggest cost-down options (relax tolerances, change material, adjust geometry)
  • Written approval required before sampling begins — email confirmation or PO acceptance

Adım 4 - 3-7 Günde Örnek Üretim

Teklif onayı ve tasarım dondurulduktan sonra örnek üretim aşamasına geçilir.

Sample TypeTypical Lead TimeWhat You Receive
Single prototype3–5 business daysPhysical part + dimensional report (CMM data)
Multi-part assembly5–7 business daysAssembled unit + sub-part FAI reports
Urgent / same-day24–48 hoursPart only — expedited through priority queue

Adım 5 - Son Kontrol ve Teslimat

Her örnek parti, paketlemeden önce dört aşamalı bir kalite kapısı geçer.

  • Packaging: PE foam + carton for standard; wooden crate for heavy assemblies (> 25 kg)
  • Shipping: EXW, FOB, DDP, or DAP — your choice. We work with DHL, FedEx, sea freight, and rail (EU)
  • Documentation: packing list, commercial invoice, material certificate, COO, and any requested test reports
  • After sample approval: your engineer transitions the order to production scheduling and volume QC planning

Takvim Özeti - Örnek Aşaması

Aşağıdaki tablo, örnek ve protip aşamasındaki tipik tedarik sürelerini özetlemektedir.

StageDurationGate / Deliverable
File upload & quoteWithin 24 hoursCosted BOM with DFM flags
Engineer DFM review1–2 business daysMarked-up DFM report
Design revision (if needed)Same dayUpdated quote
Quote approvalCustomer-dependentWritten approval or PO
Sampling3–7 business daysFirst-article part + FAI report
Inspection & packing1–2 business daysFinal inspection report + packing photos
Shipping3–7 days (air) / 20–35 days (sea)Tracking number + shipping docs

What Happens After Sample Approval?

Once you approve the first-article samples, your dedicated engineer transitions the project to the production phase. This includes production scheduling, volume-specific QC protocols, packaging specifications, and — for stamping orders — die fabrication and tryout. The sample workflow above is designed to validate your design and our process before committing to production investment.

SSS

Yazan

T

Tom

Kıdemli Süreç Mühendisi

[email protected]

Sac metal işçiliği, CNC tezgah işçiliği ve yüzey işleme konusunda uzmanlaşmış deneyimli bir üretim mühendisi. Mühendislerin bilinçli tedarik kararları almasına yardımcı olmak için pratik rehberler yazar.

Projenize başlamaya hazır mısınız?

24 saat içinde DFM geri bildirimi ve teklif alın. Minimum sipariş miktarı yok.

İlgili makaleler

"Kaynak fabrika" gerçekte ne anlama gelir? WERIX nasıl farklı çalışır
Şirket

"Kaynak fabrika" gerçekte ne anlama gelir? WERIX nasıl farklı çalışır

kendini kaynak fabrika olarak tanıtan her üretici gerçekten de öyle değildir. Gerçek bir kaynak fabrikayı atölye fotoğraf çekimli bir ticaret şirketinden ayıran şey budur.

Oku
Sac malzeme seçimi: Çelik, alüminyum, paslanmaz çelik ve daha fazlası
Teknik rehber

Sac malzeme seçimi: Çelik, alüminyum, paslanmaz çelik ve daha fazlası

Doğru sac malzemeyi seçmek maliyeti, ağırlığı, mukavemeti ve korozyon direncini etkiler. Çelik, alüminyum ve paslanmaz çelik derecelerinin pratik karşılaştırması.

Oku
Kaliteden ödün vermeden sac maliyetlerini düşürmenin 8 kanıtlanmış yolu
Tasarım rehberi

Kaliteden ödün vermeden sac maliyetlerini düşürmenin 8 kanıtlanmış yolu

Eğri yarıçapı optimizasyonundan malzeme yuvalamasına kadar — parça performansını korurken maliyeti düşüren sekiz uygulanabilir tasarım ve tedarik stratejisi.

Oku